RECENT MAJOR CONTRACTS – NEW ZEALAND & AUSTRALIA

Information Request

2020

  • Roundwood NZ – Boiler relocation, including new Header & pipelines
  • CHH Plywood – Hot press & Hydraulic cylinders welding repair work.
  • NZ Manuka – Annual servicing & steaming tests of local and remote location boilers.

2019

  • AFFCO Nationwide safety inspections of all their operational boilers.
  • Whakatane Mill – No.4 power boiler project – upgraded to Unattended status.
  • PanPac Napier – steam valves replacement & boiler tube repairs.
  • Methanex – R441 boiler – supply & install replacement wall tubes.
  • Fonterra Stirling – Winter Annual service & maintenance program.
  • Fonterra Reporoa – Annual servicing of 2 boilers.
  • Boiler operator training for Fonterra Stirling & Cedenco Foods.

2018

  • OJIFS Tasman – Recovery boiler and Steam plant annual shut welding & fitting.
  • OJIFS Kinleith – Tube bending & supply  – 2″ gun port boiler tube spares.
  • Nova Energy Edgecumbe – Boiler wall tube repairs.
  • CHH Woodproducts – Annual shut pipework & ASME welding.
  • A number of Fonterra factories nationwide – Winter Annual maintenance.
  • Manildra Starches Australia – major upgrades to Boilers 2, 4 & 6.
  • Natures Flame – Repairs to Kidney plate and replace tubes.
  • Bega Cheese Australia – Boiler combustion upgrade.
  • PanPac – Boiler & economiser tube repairs.

2017

  • Pukepine , TePuke – Modify, retube & install 2nd firetube boiler.
  • Manildra Starches – Planning for Boiler retube & major plant upgrades.
  • Trustpower – Matahina dam turbine runner repairs in situ.
  • Boiler Quarterly & Annual Surveys & servicing at our client sites during year.
  • Fonterra – Annual maintenance & quarterly surveys across many of their sites.
  • Purepine Mouldings – Cochran boiler retube and steam piping projects.
  • OJIFS Kinleith – #3PB & RB5 Annual shut pipe, tube & general welding work.
  • PanPac Napier – Steam coils, boiler tube repairs and welding services.

2016

  • Fonterra Waitoa – 3x boiler grates & multi-cyclone annual maintenance.
  • OJIFS Tasman – Evaps dome supply and replacement.
  • Alliance Meats – Mud drum repair & blowdown pipe replacement.
  • PanPac Napier – Boiler blowdown vessel relocation.
  • PanPac Napier – Boiler 2 wall tube repairs.
  • OJIFS Tasman – Power Boiler secondary Superheater tubes repairs.
  • Manildra Starches – Boiler 5 lower economiser replacement.
  • Manildra Starches – Boiler 6 Economiser & grit reticulation system.
  • Iceland Drilling – Geothermal pipework modifications.
  • Ballance Kapuni – Mud drum header repairs.

2015

  • Fonterra Waitoa – 3x boiler grates & multi-cyclone annual maintenance.
  • Manildra Starches – Boiler 5 retube, upgrade and repair works.
  • CHH Tasman – Shut works.
  • CHH Kinleith – Shut works.
  • BR & SL Porter – Installation of 1820Kg/Hr steam boiler.
  • PanPac Napier – Economiser manufacture & installation.
  • Fonterra Tirau – Deaerator repair & pipework.

2014

  • Fonterra Waitoa – Precipitator, 3x boiler grates & multi-cyclone annual maintenance.
  • Fonterra Edendale – #3 Boiler Partial retube.
  • Fonterra Stirling – 8MW Boiler retube.
  • CHH Tasman & Kinleith – Shut works.
  • Methanex Motonui – Front wall refractory replacement.
  • Methanex Waitara Valley – Boiler sidewall tubes replacement.
  • Leader Foods – install heat plant & pipework.

2013

  • Ballance Kapuni – 30TPH Waste Heat boiler gas train.
  • North Island Mussels – Re-route cooker steam line.
  • BR&SL Porter – Boiler tube plate repair.
  • Pukepine, TePuke – Reroll Boiler Tubes and Repair.
  • Norske Skog, Kawerau – TA3 Exhaust and Ducting.
  • CHH Tasman, Kawerau – March Shut.
  • CHH Tasman, Kawerau – Repair Cracks in Superheater.
  • Cedenco Foods, Gisborne – Repairs to Boiler.
  • CHH Kinleith, Tokoroa – May Shut and Installation of Cascade Wheel.

2012

  • Ballance Agri Nutrients Kapuni, Design/Fabrication, Supply, Installation, Commissioning to Commercial Steaming Standards of 30t/hr Waste Heat Flue Gas Boiler.
  • CHH Tasman, Shut Work.
  • Fonterra Waitoa, Boiler 4 Grate Overhaul.
  • PanPac Forest Products, Economiser Repairs.
  • Trust Power, Cavatation Preventation /Monitoring/ Repair.
  • Fonterra Waitoa, Grate Shaft Bearing Replacement.
  • CHH Kinleith, May and September Shuts.
  • CHH Woodproducts-Whangerei, Tube Expanding.
  • Fonterra Waitoa, Machine Shaft and Install Grate Seals. CHH Kinleith, Fabricate and Install Causticisng Spools.
  • Manildra Starches, Australia, Replace Economiser Elements.
  • Transfield Worley, Design/Fabrication, Supply, Installation, Commissioning to Commercial Steaming Standards of 7mw Lignite Coal Fired Boiler.

2011

  • Kinleith – May and September Shuts.
  • Kinleith – RB4 Sootblower Isolation Valves.
  • Kinleith – Installation of Pipebridge.
  • Tasman – Shuts, Handrails on Hot Lime Tanks.
  • Kinleith – RB4 Roof and Wall Tubes.
  • Westland Milk Products – Retractable Sootblower Installation.
  • Fonterra Waitoa – Grate castings spares.
  • Fonterra Waitoa – Re-build of Grate.
  • Fonterra Hautapu – Re-tube Boiler.
  • Fonterra Hautapu – No. 2, Grate Repairs.
  • Open Country Dairy Co – Supply of Enchem Level 2 Boiler Operators.
  • Fonterra Takaka – Repair Re-circulating Duct in Air-Heater.
  • Ballance Agri Nutrients Tauranga – Superheater Fabrication and commissioning.

2010

  • Fonterra Waitoa, Grate Repairs.
  • North Island Mussel Processors, S/S Steam Line.
  • PanPac Forest Products, Installation of Economiser.
  • H.C Extractions (Australia), Installation of Heat Recovery Oil Heater.
  • CHH Tasman – Repair Air Heater Elements.
  • PR & S Snook & Sons – Refurbish Boiler.
  • CHH Kinleith – Repairs to Cascade Wheel.
  • Whakatane Hospital – Steam Compliance.
  • Pan Pac Forests – Boiler Survey.
  • Bega Cheese Australia– Repair leaks and refractory maintenance.
  • Manildra Starches, Nowra, Australia – Generating Bank Re-tube.

Information Request